Home / Custom Manufacturing

Custom Manufacturing

Built to your specification, not to a catalogue

Most of what we ship is not a standard catalogue item. Rated power, voltage ratio, vector group, loss limits, protection scheme and finish are all set by the project — and confirmed in writing before production starts.

Process

Six steps, no surprises

Custom equipment fails on uncertainty rather than price. This is the sequence every order follows, and what you receive at each stage.

Step 01

Send your parameters

Rated power, voltage ratio, cooling method, installation environment and required delivery date. A single-line diagram helps but is not required.

Step 02

Engineering review

We check feasibility, loss figures and compliance with your local grid code before any price is issued.

Step 03

Quotation and drawing

Price, lead time and an outline drawing for your approval before production starts. Units up to 35 kV run 20 days from drawing approval; 110 kV class units around 60 days.

Step 04

Manufacturing

Core cutting, winding, oil processing, tank fabrication and assembly, all in our own works.

Step 05

Routine testing

Every unit is tested before packing. Customer or third-party witness testing can be arranged.

Step 06

Packing and shipment

Seaworthy packing, export documentation and logistics to your destination port.

What we need from you

You do not need a complete specification to start. These five values are enough for a first technical answer.

  • Rated power (kVA) and quantity
  • Voltage ratio, e.g. 33/0.415 kV
  • Cooling method: ONAN, ONAF, or tell us the site and we will advise
  • Installation environment: indoor, outdoor, coastal, altitude
  • Required delivery date and destination port

Not sure about a value?

Leave it blank and say so. Our engineers will propose a value based on the site conditions and the load profile — that is what the review step is for.

Next step

Have a specification ready?

Send it as a PDF or Excel file. We will reply with a technical proposal, price and lead time within one working day.