Home / Factory & Capacity

Factory & Capacity

28,000 m² in Hefei, 1,700 units a year

Design, winding, core assembly, tank fabrication, oil processing and routine testing all happen on one site — which is why a non-standard configuration does not add six weeks to the schedule.

Transformer production hall, Hefei

2011

Established

28,000 m²

Production area

1,700

Units per year

20 / 60

Days to ship, ≤35 kV / 110 kV

Inside the works

Every stage, one address

Core cutting, winding, tank welding, sheet metal, switchgear assembly, testing and packing — all in the same building. That is what keeps a non-standard unit at weeks rather than months, and it is why nothing here is a stock photograph.

Winding — Changda Power works, Hefei

WindingCopper or aluminium conductors wound to the loss figure in your tender, not to a catalogue slot.

Core stacking — Changda Power works, Hefei

Core stackingStep-lap CRGO core stacked by hand — the joint quality decides no-load loss and noise.

Core and windings — Changda Power works, Hefei

Core and windingsLimbs, coils and insulation braced before the unit goes into its tank.

Tank fabrication — Changda Power works, Hefei

Tank fabricationTanks welded in-house, so a non-standard dimension does not wait on a subcontractor.

Sheet metal — Changda Power works, Hefei

Sheet metalCabinets, covers and enclosure parts cut and bent on the same site.

Switchgear assembly — Changda Power works, Hefei

Switchgear assemblyRing main units and LV assemblies built beside the transformer lines, on one protection scheme.

Routine testing — Changda Power works, Hefei

Routine testingRatio, resistance, impedance, losses and dielectric tests on every unit before packing.

Charging stations — Changda Power works, Hefei

Charging stationsDC fast charging cabinets assembled and run on load alongside the transformer lines.

Packing and loading — Changda Power works, Hefei

Packing and loadingSeaworthy packing and container loading at the works, not at a forwarder’s yard.

Units shown are in production for live orders. Customer names on nameplates are not published.

Aerial view of the transformer works, Hefei

What happens on site

  • Core cutting and step-lap stacking
  • Winding, copper or aluminium
  • Tank fabrication and surface treatment
  • Oil processing and vacuum filling
  • Assembly, wiring and protection setting
  • Routine testing and packing

Keeping these steps in-house is what allows short runs and non-standard configurations to be quoted without a six-week penalty.

Works: Southeast corner of Zhandong Road and Jiangning Road, Xiatang Industrial Park, Xiatang Town, Changfeng County, Hefei, Anhui, China
Tel: +86 551 6263 5523

Lead times

Two figures, and we would rather put both on the table than average them into one number that only holds for small units.

Up to 35 kV, standard configuration20 days from approved drawing
110 kV class, 6.3 – 63 MVAAround 60 days from approved drawing, with a third-party type test booked inside that figure if your specification requires one

Both figures start at drawing approval and cover core cutting, winding, tank fabrication, oil processing, routine testing and packing — all on one site, which is what keeps them short.

The 110 kV figure is longer for two reasons: the insulation build is slower at this level, and a type test — if your specification calls for one — has to be booked at an accredited third-party laboratory, so the test slot sits inside the schedule rather than after it.

Give us the delivery date you need at enquiry stage. We will confirm it in writing with the quotation — before you commit to anything.

What decides your date

  • Drawing approval — the clock starts here
  • Quantity — units are built and tested in sequence
  • 110 kV type testing at an accredited laboratory, where specified
  • Destination port and shipping schedule
  • Witness testing, if your consultant requires it

Next step

Want to see the works?

We can arrange a video walkthrough of the line and the test bay for projects under evaluation.