Home / Custom Manufacturing
Custom Manufacturing
Built to your specification, not to a catalogue
Most of what we ship is not a standard catalogue item. Rated power, voltage ratio, vector group, loss limits, protection scheme and finish are all set by the project — and confirmed in writing before production starts.
Process
Six steps, no surprises
Custom equipment fails on uncertainty rather than price. This is the sequence every order follows, and what you receive at each stage.
Step 01
Send your parameters
Rated power, voltage ratio, cooling method, installation environment and required delivery date. A single-line diagram helps but is not required.
Step 02
Engineering review
We check feasibility, loss figures and compliance with your local grid code before any price is issued.
Step 03
Quotation and drawing
Price, lead time and an outline drawing for your approval before production starts. Units up to 35 kV run 20 days from drawing approval; 110 kV class units around 60 days.
Step 04
Manufacturing
Core cutting, winding, oil processing, tank fabrication and assembly, all in our own works.
Step 05
Routine testing
Every unit is tested before packing. Customer or third-party witness testing can be arranged.
Step 06
Packing and shipment
Seaworthy packing, export documentation and logistics to your destination port.
What we need from you
You do not need a complete specification to start. These five values are enough for a first technical answer.
- Rated power (kVA) and quantity
- Voltage ratio, e.g. 33/0.415 kV
- Cooling method: ONAN, ONAF, or tell us the site and we will advise
- Installation environment: indoor, outdoor, coastal, altitude
- Required delivery date and destination port
Not sure about a value?
Leave it blank and say so. Our engineers will propose a value based on the site conditions and the load profile — that is what the review step is for.
Next step
Have a specification ready?
Send it as a PDF or Excel file. We will reply with a technical proposal, price and lead time within one working day.

