Home / Factory & Capacity
Factory & Capacity
28,000 m² in Hefei, 1,700 units a year
Design, winding, core assembly, tank fabrication, oil processing and routine testing all happen on one site — which is why a non-standard configuration does not add six weeks to the schedule.

2011
Established
28,000 m²
Production area
1,700
Units per year
20 / 60
Days to ship, ≤35 kV / 110 kV
Inside the works
Every stage, one address
Core cutting, winding, tank welding, sheet metal, switchgear assembly, testing and packing — all in the same building. That is what keeps a non-standard unit at weeks rather than months, and it is why nothing here is a stock photograph.

WindingCopper or aluminium conductors wound to the loss figure in your tender, not to a catalogue slot.

Core stackingStep-lap CRGO core stacked by hand — the joint quality decides no-load loss and noise.

Core and windingsLimbs, coils and insulation braced before the unit goes into its tank.

Tank fabricationTanks welded in-house, so a non-standard dimension does not wait on a subcontractor.

Sheet metalCabinets, covers and enclosure parts cut and bent on the same site.

Switchgear assemblyRing main units and LV assemblies built beside the transformer lines, on one protection scheme.

Routine testingRatio, resistance, impedance, losses and dielectric tests on every unit before packing.

Charging stationsDC fast charging cabinets assembled and run on load alongside the transformer lines.

Packing and loadingSeaworthy packing and container loading at the works, not at a forwarder’s yard.
Units shown are in production for live orders. Customer names on nameplates are not published.

What happens on site
- Core cutting and step-lap stacking
- Winding, copper or aluminium
- Tank fabrication and surface treatment
- Oil processing and vacuum filling
- Assembly, wiring and protection setting
- Routine testing and packing
Keeping these steps in-house is what allows short runs and non-standard configurations to be quoted without a six-week penalty.
Works: Southeast corner of Zhandong Road and Jiangning Road, Xiatang Industrial Park, Xiatang Town, Changfeng County, Hefei, Anhui, China
Tel: +86 551 6263 5523
Lead times
Two figures, and we would rather put both on the table than average them into one number that only holds for small units.
| Up to 35 kV, standard configuration | 20 days from approved drawing |
|---|---|
| 110 kV class, 6.3 – 63 MVA | Around 60 days from approved drawing, with a third-party type test booked inside that figure if your specification requires one |
Both figures start at drawing approval and cover core cutting, winding, tank fabrication, oil processing, routine testing and packing — all on one site, which is what keeps them short.
The 110 kV figure is longer for two reasons: the insulation build is slower at this level, and a type test — if your specification calls for one — has to be booked at an accredited third-party laboratory, so the test slot sits inside the schedule rather than after it.
Give us the delivery date you need at enquiry stage. We will confirm it in writing with the quotation — before you commit to anything.
What decides your date
- Drawing approval — the clock starts here
- Quantity — units are built and tested in sequence
- 110 kV type testing at an accredited laboratory, where specified
- Destination port and shipping schedule
- Witness testing, if your consultant requires it
Next step
Want to see the works?
We can arrange a video walkthrough of the line and the test bay for projects under evaluation.

