Home / Projects

Projects

Reference projects and where our equipment runs

We supply utilities, EPC contractors and industrial plants across the Middle East and Africa. Three projects we can publish are below; the full reference list — capacity, year, destination and application — is released on request.

Selected projects

Built, tested and shipped

Each of these was a project-specific build rather than a catalogue unit. Client names are withheld where the contractor has not agreed to be named; the country, year and scope are correct.

TZTanzania · 2024

11 kV packaged substation, water treatment plant

11 kV · Packaged substation · Plant distribution

A packaged substation feeding the distribution network inside a water treatment plant: 11 kV intake, plant LV distribution, assembled and routine-tested as one unit before it left the works.

AUAustralia · 2026

11 kV / 3.3 kV step-down supply

11 kV / 3.3 kV · Project specification

Transformers built to an Australian project’s own ratio, impedance and documentation requirements — the case where the tender sets the design and the catalogue does not apply.

ETEthiopia · 2026

24.9 kV / 0.38 kV substations for EV charging

24.9 kV / 0.38 kV · Packaged substation · EV charging

Packaged substations feeding DC fast charging sites: 24.9 kV incoming, 0.38 kV outgoing, sized around the charging cabinets installed on each site.

Why references are released on request

Many of our projects are supplied through EPC contractors and consultants who do not publish their supplier lists, and some destinations require discretion. Rather than publish a list we cannot fully verify, we send a project-specific reference list covering the country, application, capacity and year — without client names unless they have agreed to be named.

If you need references for a specific country or application, say so in the enquiry and we will send the closest matches.

What we can confirm now

  • 10 export countries, primarily Middle East and Africa
  • Projects across utility distribution, renewables, industry and infrastructure
  • Units from 30 kVA to 3,150 kVA, 10 kV and 35 kV
  • Year of supply and destination country available per project
  • Published above: Tanzania 2024, Australia 2026, Ethiopia 2026

Next step

Need references for a tender?

Tell us the country, application and capacity range. We will send the closest match from our project list, with year and scope.